Normal problem in quartz stone in lay-up and how to solute it
These years, quartz stone applied
to the engineering field gradually, due to the lack of cognitive for quartz, choose
the improper bonding materials when lay-up, improper operation method, cause
many defects, lead to large area of rework, causing the waste of resources.
Comprehensive
analysis has the following several reasons:
1. Choose wrong
binder, lead to slabs loose or cock. Because Quartz stone containing resin,
heat bilges cold shrink, cause slabs extrusion. Expansion coefficient is marble
and ceramic tile several times. So need according to deformation matching
binder.
2. The width of
the gap between two slabs is not accurate.
3. Inaccurate caulking
materials lead to quartz slabs edge crack.
4. The treatment
of back ground of wall and floor and quartz slabs.
HR - MEZE has
quartz slabs solutions and professional construction guidance, welcome to
consultation and discussion.